|
|
planning-applications.co.uk |
|
AGRICULTURAL BUILDINGS AND OPERATIONS
NOTIFICATION PROCEDURE
The following requirements DO NOT apply to the EXTENSION or
ALTERATION of a building, if the building is NOT on Article 1 (6) land, unless
the extension or alteration is SIGNIFICANT.
CHECK FIRST
In other words, if your proposed alteration or extension of a
building is not on Article 1(6) land and is not significant, you do not need to
proceed through the notification procedure.
IN ALL OTHER CASES THE FOLLOWING CONDITIONS APPLY
Development
consisting of the erection, alteration or extension of a building, the
formation or alteration of a private way, or the carrying out of excavations or
the deposit of waste material (where the relevant area exceeds 0.5ha) or
the placing or assembly of tanks in any waters, is permitted subject to the
following:-
The
person undertaking the development shall apply to the local planning authority
in advance of works commencing for a DETERMINATION. This determination is
required to give the Council a chance to decide whether it is necessary for
them to give prior approval of :-
Your
application for a determination must be accompanied by:-
(NOTE:
the Council may provide a form for this application, but you can apply in
letter form with the information required)
YOU MAY
NOT BEGIN DEVELOPMENT UNTIL EITHER:-
WHERE
PRIOR APPROVAL IS REQUIRED:-
IN ALL
CASES THE
DEVELOPMENT MUST BE CARRIED OUT:-
IN
CIRCUMSTANCES WHERE DEVELOPMENT CONSISTS OF THE ERECTION, SIGNIFICANT EXTENSION
OR SIGNIFICANT ALTERATION OF A BUILDING AND:-
THEN, unless the Council has agreed otherwise
in writing, the building, (or the extension), must be removed from the land and
the land restored (as far as possible) to its condition before the development
took place; or to such condition as has been agreed with the Council in
writing.
Any appeal
against the refusal of a planning application (or in relation to conditions)
will postpone this requirement until finally determined or the appeal is
withdrawn.
SUBSTANTIAL
COMPLETION OF WORKS
WORKS
THAT ARE PERMITTED FOR THE ERECTION, EXTENSION OR ALTERATION OF A BUILDING MUST
BE NOTIFIED IN WRITING TO THE COUNCIL WITHIN 7 DAYS OF THE DATE ON WHICH THE
WORKS WERE SUBSTANTIALLY COMPLETED.
|
"Relevant Area" means:- -
the area of the proposed excavation, or the area on which it is proposed to
deposit waste, together with the aggregate (sum) of the areas of all other
excavations within the unit which have not been filled and of all other parts
of the unit on or under which waste has been deposited and has not been
removed. |